Santos GLNG Primary Control Centre Brisbane
Project Details
Category
Commercial Office
Client
Santos Ltd
Location
Turbot Street Brisbane QLD
Approx Project Value
$8M
Services
Project Management / Superintendent
EdgePM is proud to have been appointed by Santos to the role of Project Manager to manage the design and delivery of this ground-breaking state of the art Primary Control Centre facility (PCC) in the Brisbane CBD. Completed in 2012, the new facility has changed the way that Santos operates its gas fields in the Bowen and Surat basins. The project was delivered under a lump sum procurement method.
A YouTube video of Santos’ project can be viewed here.
Are you interested and want more information? Do not hesitate to contact us. Call 07 3229 9712 or email us.